|
Initial Consultation
- Review site/structural existing conditions
- Develop design requirements
- Review owner's concerns/questions/budget
- Determine architectural & construction schedule
Contract
- Outline of proposed architectural services
- Fee structure
Measure and Draw Phase
- Documentation of existing conditions
Preliminary Schematic Design & Final Design Phases - Consultations w/ Owner
- Drawings based on design requirements
- Review(s) with owner
- Preliminary construction cost estimate
- Revisions to design as required
|
Construction Documents Phase
- Site plan
- Floor plan(s)
- Elevations
- Section(s)
- Details
- Plumbing/heating/electrical as required
- Outline specification
- Door & window schedule
- Updated construction cost estimate
Bid-Negotiation Phase
(if owner has selected a general contractor, this phase may not be required)
- Construction documents/specifications provided to general contractor(s) for pricing
- Meeting with contractor(s) to review project/drawings
- Assist w/ negotiations between owner/general contractor
Construction Administration
- On site visits to determine that construction is consistent with drawings/details/specifications
- Discussions regarding questions about drawings/details/specifications
|